1 2 3
Keyword:

Mesh belt drying equ
 Vegetable mesh belt ...
 Traditional Chinese ...
 Fruit mesh belt drye...
 Incense mesh belt dr...
 Paper products mesh ...
 Food dryer equipment...
Heat pump dryers
 Van type drying mach...
 Split drying machine...
Fruit and vegetable
 The mushroom dry sep...
 Walnut drying equipm...
 Hawthorn piece of dr...
 Vegetables drying eq...
 Fruit drying equipme...
 Filming machine seri...
 Electric heating dry...
Chinese herbal medic
 Box Chinese herbal m...
 Mesh belt type Chine...
Wood drying equipmen
 Fission disassemblin...
 Wood veneer dryer...
 Annatto wax injectio...
 High frequency vacuu...
Drum drying equipmen
 Sawdust, vinasse dry...
 Chicken manure, cow ...
 Quartz sand, fluorit...
 Sand, mineral powder...
dust wiperseries
 bag-type dust collec...
  desulfurizing tower...
Microwave dryer
Rotation flash dryer
The subject (hot bla
burning gas instead
Biomass burning mach
Other equipment
Some accessories to
LinQu Wei Yang machinery equipment factory
Contact: Mr. Zhang
Telephone: 0536-3119287
Fax: 0536-3119287
Mobile phone: 15864583687 18663615891
E-mail: cnwmhg@126.com
Zip code: 262600
The opening bank, agricultural bank of China co., LTD. LinQuXian subbranch of a bank
Bank account number: 15442001040020491
Address: shandong LinQuXian city industrial park 
Product
Hot bar shear furnace (click to enter)
Keyword:

Cut long stick hot furnace



More than automatic cut long stick hot furnace technology parameters

 

  More than automatic cut long stick hot furnace thermal, mechanical, automation control, hydraulic, photoelectric and temperature measuring for the integration of new production equipment, as long as the incoming transmission bar conveying rack, furnace, hot shearing machine and electrical control parts.

 

一、 Product design benchmark:

number Of the goods Type Extruder tonnage and direction

Aluminum rod diameter/length Furnace rods for storage The thermal camber of shear
1 Cut long stick hot furnace LRJ-150 1200T Φ150×6000mm 12支 80T

Second, the working principle:
Will be fused cast Cu company long aluminum rods in the loading frame first, by rolling stick front into a long stick from of a root into the rod to the reheating furnace heating. In the process of the heating bar will flip, mobile. Each bar heating duration of no less than 2 hours later, in transmission rod mechanism driven by long rods are gradually into heat within the shear scale, and the fixed knife in the bar, under the influence of shear cylinder, promote activity c2: under the knife cut the bar, and then by the top rod oil cylinder to set a fixed knife bar outside.
Three, the main technology can count

number name Adaptation of 1200 t extruder main technical parameters
1 Hydraulic power station 18.5kw
2 The circulation fan power 11.5kw
3 The heating temperature 480℃—550℃
4 Start the heating time 3h—4h
5 Furnace shape size  
6 Aluminum rod temperature difference ±10℃

Four, the main configuration parameters:


 1、 the shear heat engine

number name Technical parameters
1 Cut the main steel

Φ300
2 Other oil cylinder

The 8 suites
3 Into the bar and get great institutions Self-aligning bearing, chain wheel
4 scissors Use of H13 die steel, hardness HRC46-48
5 Length institutions According to the production need to determine the shear length, 300 ~ 800 mm is adjustable
2 furnace
number name Technical parameters
1 Furnace shell Use 3 mm steel plate welded steel welding, the shell
2 Thermal insulation layer 300 mm thick glass fiber insulation cotton
3 In the bore protector With 304 stainless steel plate, 2 mm thick with thermal expansion expansion joints
4 Circulating air duct 2 mm thick with 304 stainless steel plate, making the wind, manual damper
5 Double rods institutions Hydraulic double rods, specially designed cast iron is set up and down, to ensure smooth shift rod
6 Roll bar frame Inclined type automatic bar frame, aluminum rods into the furnace process gradually
7 Submitted to the office of rods Shaft rotation
8 Measuring rod mechanism Three sets of measuring rod mechanism, to realize automatic picking up sticks and moving rod and into the bar is very accurate
9 Air cooling system 550 w centrifugal fan on the shaft and bearing cooling
10 In and out of the oven door Cylinder automatic doors
11 Maintenance of the mouth Furnace side before and after the oven can be observed in furnace operation, convenient maintenance
2、   The fuel chamber
number name Technical parameters
1 The fuel chamber structure Use 3 mm steel plate welded steel welding, the shell
2 Combustion tube 310 s stainless steel tube, 4 mm thick, installed in the outlet of fan, make the fuel burn barrel not burn out
3 crater With 310 s stainless steel bell mouth, use in combustion nozzle flange and stainless steel bolts
4 The high temperature fan Casing is 2 cr13, impeller, shaft of 304 s, high temperature fan cooling system adopts water cooling, conducive to enhancing the effect of energy conservation and emissions reduction
Name Adaptation of 1200 t extruder main technical parameters
Into the rods, marry a stick 1.5kw
Pick up the length of the bar 300~800mm
Cut the bar by vertical accuracy ±2mm
fuel The fuel gas
consumption Gas / 12 hours a day around 900
Temperature measurement way Thermocouple 3 groups
Electrical system Mitsubishi PCLS control
The hydraulic system Wide liquid double vane pump, hydraulic valve
In good way Junior rod type